Work at El Soldado, Chile
A bespoke 150,000m3 capacity HDS tailings facility has been built at the El Soldado copper mine. The sand transportation and placement system was commissioned in August 2022 and tailings placement commenced at the start of November 2022.
Early results measured water recovery at more than 80 percent, and the extensive instrumentation is confirming that the tailings remain unsaturated.